Practice Free MB-335 Exam Online Questions
DRAG DROP
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture’ receives and inspects the car, the replacement car can be released to the company. You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content. Note: Each correct selection is worth one point.

Explanation:
To select the maintenance request components to use, you should use the following:
The leased car that must be repaired: You should use the Inbound asset component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset: [Outbound assets]
You must ensure that the firepit product is available for sale.
How should the product be released?
- A . Release the engineering product version and then assign the route.
- B . Connect the BOM to an engineering product version before release.
- C . Connect a route to an engineering version before release.
- D . Release the engineering product version and then assign BOM.
HOTSPOT
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area. NOTE: Each correct selection is worth one point.


A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co-products and change the formula to not produce the primary formula item. You need to change the primary formula item type.
What should you do?
- A . Change the cost of the primary formula item to zero and then recalculate the item cost.
- B . Change the production type to Bill of materials and recalculate the item cost.
- C . Associate the costs to produce by-products with the items.
- D . Change the primary formula item to use the planning item type.
DRAG DROP
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity. You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Explanation:
To define the production life cycle stages, you should perform the following actions in sequence:
Create a production order. A production order is a document that authorizes the production of a specific product or product variant in a given quantity on a specific date1. You can create a production order manually, from a sales order line, or from master planning execution2.
Estimate the order. Estimating a production order calculates the material and capacity requirements for the order based on the bill of materials (BOM) and the route3. You can also estimate the cost and revenue of the order based on the planned consumption and output.
Schedule production jobs. Scheduling production jobs determines the start and end dates and times for each operation in the route based on the available capacity, efficiency, and calendar of the resources. You can use either operations scheduling or job scheduling methods to schedule production jobs.
Release the order. Releasing a production order makes it available for picking, production, and reporting activities. You can release an order manually or automatically based on a release rule that specifies criteria such as site, warehouse, status, priority, or start date.
Generate a picking list. A picking list is a document that lists the materials that must be picked from inventory and consumed for production. You can generate a picking list for an entire production order or for selected jobs or operations within an order.
1: Production process overview 2: Production order lifecycle overview 3: Estimate a production
order: [Estimate cost and revenue for a production order]: [Schedule production jobs]: [Scheduling methods]: [Release a production order]: [Release rules]: [Picking list overview]: [Generate picking lists]
DRAG DROP
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


You need to configure the controller’s ModelB asset requirements for the off-season.
What should you do?
- A . Use the default functional location
- B . Create a functional location.
- C . Create a location profile.
- D . Create a location type.
DRAG DROP
A company plans to account for indirect costs related to materials used to manufacture products. The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


DRAG DROP
A company uses the production control module in Dynamics 365 Supply Chain Management. Production workers require precise instructions to know which tools and parts to use and how to use them when the workers put things together during the assembly process.
You need to configure the system to initiate mixed reality Dynamics 365 Guides for production workers.
Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


HOTSPOT
A company implements Dynamics 365 Supply Chain Management.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area. NOTE: Each correct selection is worth one point.


