Practice Free MB-335 Exam Online Questions
DRAG DROP
A company uses multiple Dynamics 365 applications to track and repair equipment.
The company wants to improve its repair order process. Repair technicians frequently encounter unexpected issues daily.
The technicians must be empowered to address the issues and create new work orders by doing the following:
• Provide step-by-step, just-in-time training for work order completion in the field by using videos and text.
• Document work order creation in a single, printable document.
• Report on the use of hands-on training.
You need to implement a solution forth requirements.
Which solution should you implement for each requirement? To answer, drag the appropriate solutions to the correct requirements. Each solution may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

Explanation:
To implement a solution for the requirements, you should use the following solutions:
Just-in-time training: You should use Dynamics 365 Guides. This solution allows you to create interactive, step-by-step learning experiences for repair technicians in the field. You can use videos, images, and text to provide instructions and tips for work order completion. You can also use mixed reality tools to overlay holograms on physical objects and guide technicians through complex tasks.
Work order creation document: You should use Dynamics 365 Supply Chain Management. This solution allows you to create and manage work orders for equipment maintenance and repair. You can use the Work order page to enter the details of the work order, such as the customer, the equipment, the service tasks, the materials, and the costs. You can also print a work order report that summarizes the information in a single document.
Training reporting: You should use Dynamics 365 Guides. This solution allows you to track and analyze the usage and effectiveness of your guides. You can use Power BI dashboards to view metrics such as completion rates, duration, errors, and feedback for each guide and step. You can also filter the data by date, location, operator, or device.
: [What is Dynamics 365 Guides?]: [Work orders overview]: [Print a work order report]: [Analyze guide effectiveness]
DRAG DROP
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear on the review screen.
A manufacturing company produces electronic components and devices.
The company has scheduling issues related to using working time calendars in manufacturing.
You need to ensure that the working time calendar is used when manufacturing jobs are scheduled.
Solution: Enable automatic consumption of run time.
Does the solution meet the goal?
- A . Yes
- B . No
A company plans to use master planning in Dynamics 365 Supply Chain Management. The company will sell items between legal entities.
The company has several facilities across legal entities that can manufacture the same products. Same products are produced only in some plants. To meet product demand, when one facility is over capacity, another facility is used to fulfill the downstream demand.
The organizational entities are:
• LegalEntity A: Plant 1.2, and 3
• LegalEntity B: Plant4and 5
• LegalEntity C: Plant 6. 7, and 8
The following plants must be planned together:
• Plant 1. Plant 3. and Plant 4
• Plant 2. Plant 6. and Plant 8
• Plant 5 and Plant 7
You need to configure master planning for the facilities.
Which configuration mechanism should you use?
- A . Production groups
- B . Item model groups
- C . Coverage groups
- D . Intercompany planning groups
D
Explanation:
The configuration mechanism that you should use is Intercompany planning groups.
Here is the explanation:
Intercompany planning groups are groups of companies that are planned together in master planning. Intercompany planning groups allow you to include planned downstream demand from other companies in your master plan, and also to peg across companies by using multilevel pegging1. You can use intercompany planning groups to plan for intercompany sales and purchases, and to optimize the production capacity across companies1.
In this scenario, you need to configure master planning for the facilities that must be planned together. To do this, you should create intercompany planning groups that include the relevant plants from different legal entities. For example, you can create an intercompany planning group that includes Plant 1, Plant 3, and Plant 4 from LegalEntityA and LegalEntityB. You can also specify the scheduling sequence for the companies in the intercompany planning group, which determines the order in which master planning is run for each company1.
The other options are not correct, because they do not involve intercompany planning. Production groups are groups of production orders that share the same parameters, such as ledger accounts and posting profiles2. Item model groups are groups of items that share the same inventory policies, such as reservation, tracking, and costing3. Coverage groups are groups of items that share the same coverage settings, such as coverage code, period, and time fence.
1: Intercompany planning 2: Production groups 3: Item model groups: [Coverage groups]
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?
- A . Run inventory close for the BOM items for the limited-edition bicycle.
- B . Create the production order for the limited-edition bicycle and click estimate.
- C . Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
- D . Run the pricing simulator for the limited-edition bicycle for a quantity of one.
A manufacturing company uses the production control module in Dynamics 365 Supply Chain Management.
A production planner at the company must prevent resources from being allocated to multiple tasks simultaneously when the resources are already engaged in a task. You need to enable the property on the operation resource master.
Which property should you enable?
- A . Finite capacity
- B . Exclusive
- C . Job scheduling
- D . Bottleneck resource
You are a production manager at a company which produces large batches of coffee and creamers. After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution. NOTE: Each correct selection is worth one point.
- A . Manually reserve batch 120008 after estimating the batch order.
- B . Add a route operation for 0.5 run time hours of stirring.
- C . Add 20 grams of sugar to the production formula.
- D . Delete all items from the production formula except for 20 grams of sugar.
- E . Delete all route operations except for a half an hour stirring operation.
A, B, C
Explanation:
The correct answer is B, C, and E.
Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
- A . Add an activity to the production route for deliveries.
- B . Create a service product and set Stocked product – Yes.
- C . Add an activity to the production flow for deliveries.
- D . Create a service product and set Stocked product = No.
A company produces rubber hose. Discrete orders accounts for raw material scrap. The scrap is reported through inventory movement journals.
The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced. You need to account for material lost during startup.
What should you do?
- A . Enter the amount of scrap that is consumed as constant scrap in the Bill of materials
- B . Do a case study for the scrap items and enter the average amount of scrap as a separate line items on the Sill of materials.
- C . Enter the consumption amount on the line to match the actual amount used.
- D . Enter the amount of scrap that is consumed as variable scrap in the Bill of materials.
DRAG DROP
A company uses Discrete manufacturing concepts to produce cables. The company’s production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.