An administrator has just replaced a failed 4TB SAS HDD in a RAID 5 array on an HPE ProLiant server. The administrator confirms in Smart Storage Administrator (SSA) that the rebuild has started, but the logical drive is still in a "Degraded" state.
What is the correct action plan?
- A . Add a global hot spare, as the array cannot be healthy without one.
- B . Back up the data immediately, as the rebuild has failed.
- C . Replace the Smart Array controller, as it is not rebuilding correctly.
- D . No action is required. The "Degraded" state is normal *during* the rebuild process and will change to "OK" once the rebuild is 100% complete.
An administrator has just replaced a failed 4TB SAS HDD in a RAID 5 array on an HPE ProLiant server. The administrator confirms in Smart Storage Administrator (SSA) that the rebuild has started, but the logical drive is still in a "Degraded" state.
What is the correct action plan?
- A . Add a global hot spare, as the array cannot be healthy without one.
- B . Back up the data immediately, as the rebuild has failed.
- C . Replace the Smart Array controller, as it is not rebuilding correctly.
- D . No action is required. The "Degraded" state is normal *during* the rebuild process and will change to "OK" once the rebuild is 100% complete.
An IT Manager is reviewing a solution design for a server that will be repurposed.
Current Configuration:
– HPE ProLiant DL360 Gen10
– 2 x Intel Xeon-Gold 6240 (18 cores each)
– 512 GB RAM
New Workload:
– Single, large, memory-intensive database (e.g., SAP HANA)
– The database license is per-core.
– The database requires 768 GB of RAM to load in-memory.
What changes must be made to this server’s configuration to meet the new compute resource requirements? (Select all that apply.)
- A . Change the BIOS/UEFI "Workload Profile" to "Low Latency."
- B . Add a high-performance 100GbE network adapter.
- C . Add at least 256 GB of RAM.
- D . Disable one of the CPUs in the BIOS/UEFI.
- E . Replace the Xeon-Gold 6240 CPUs with CPUs that have a lower core count but higher clock speed.
An IT Manager is reviewing a solution design for a server that will be repurposed.
Current Configuration:
– HPE ProLiant DL360 Gen10
– 2 x Intel Xeon-Gold 6240 (18 cores each)
– 512 GB RAM
New Workload:
– Single, large, memory-intensive database (e.g., SAP HANA)
– The database license is per-core.
– The database requires 768 GB of RAM to load in-memory.
What changes must be made to this server’s configuration to meet the new compute resource requirements? (Select all that apply.)
- A . Change the BIOS/UEFI "Workload Profile" to "Low Latency."
- B . Add a high-performance 100GbE network adapter.
- C . Add at least 256 GB of RAM.
- D . Disable one of the CPUs in the BIOS/UEFI.
- E . Replace the Xeon-Gold 6240 CPUs with CPUs that have a lower core count but higher clock speed.
An IT Manager is reviewing a solution design for a server that will be repurposed.
Current Configuration:
– HPE ProLiant DL360 Gen10
– 2 x Intel Xeon-Gold 6240 (18 cores each)
– 512 GB RAM
New Workload:
– Single, large, memory-intensive database (e.g., SAP HANA)
– The database license is per-core.
– The database requires 768 GB of RAM to load in-memory.
What changes must be made to this server’s configuration to meet the new compute resource requirements? (Select all that apply.)
- A . Change the BIOS/UEFI "Workload Profile" to "Low Latency."
- B . Add a high-performance 100GbE network adapter.
- C . Add at least 256 GB of RAM.
- D . Disable one of the CPUs in the BIOS/UEFI.
- E . Replace the Xeon-Gold 6240 CPUs with CPUs that have a lower core count but higher clock speed.
A customer is refreshing their data center and wants to move to a "composable infrastructure" model. They want a solution that allows them to create "fluid pools" of compute, storage, and fabric that can be provisioned and updated via a single, on-premises management platform.
Which HPE platform and management tool combination is designed for this?
- A . HPE ProLiant DL servers and HPE Compute Ops Management
- B . HPE BladeSystem and iLO Federation
- C . HPE ProLiant ML servers and Intelligent Provisioning
- D . HPE Synergy and HPE OneView
A customer is refreshing their data center and wants to move to a "composable infrastructure" model. They want a solution that allows them to create "fluid pools" of compute, storage, and fabric that can be provisioned and updated via a single, on-premises management platform.
Which HPE platform and management tool combination is designed for this?
- A . HPE ProLiant DL servers and HPE Compute Ops Management
- B . HPE BladeSystem and iLO Federation
- C . HPE ProLiant ML servers and Intelligent Provisioning
- D . HPE Synergy and HPE OneView
A system administrator is troubleshooting a server with an amber Health LED. The iLO 5 Health Summary page shows the "Fans" subsystem is "Degraded."
iLO Fan Status Page:
– Fan 1: OK
– Fan 2: OK
– Fan 3: Failed
– Fan 4: OK
– Fan 5: OK
– Fan 6: OK
– Fan Redundancy: Lost
What is the correct action plan to resolve this issue and restore redundancy?
- A . Update the server’s iLO firmware to clear the false "Failed" status.
- B . Replace Fan 3 with a compatible, hot-pluggable fan module.
- C . Set the server’s BIOS "Thermal Configuration" to "Maximum Cooling."
- D . Order and replace all 6 fans, as the entire fan solution is compromised.