Practice Free MB-330 Exam Online Questions
A company creates a new bill of materials (BOMs). The company subcontracts with a vendor to manufacture one component for the BOM.
You need to ensure that only the production manager is permitted to approve BOMs.
Which two actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
- A . Assign security permissions to approve the BOM version but not the related BOM.
- B . Assign security permissions to the user for the approval form.
- C . Assign security permissions to the Vendor portal.
- D . Set up the approver as a vendor.
- E . Set up the approver as an employee.
A company produces finished goods that consist of some raw material items that are purchased and some raw material items that are produced.
The costs of some of the produced materials that are used in the sub-BOMs are updated. The costs of the purchased raw materials do not change.
You need to ensure that the updated costs are reflected in the finished goods planned costs. You do not need to recalculate the purchased raw materials.
Which explosion mode should you use in the bill of materials (BOM) calculation? Select only one answer.
- A . Multilevel
- B . Make to order
- C . Single level
- D . According to BOM line type
You need to resolve the issue for UserC.
What should you do?
- A . Change the inventory status only.
- B . Change the inventory status and run the replenishment process.
- C . Change the inventory status and complete a movement journal.
- D . Create a transfer order and change the inventory status.
A
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/quality-orders
You need to configure the system to support the pottery line.
What should you do first?
- A . Set up a new product with product configuration.
- B . Create a new product with tracking dimensions.
- C . Create a new product master with pre-defined product variants.
- D . Create a new product with storage dimensions.
C
Explanation:
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/tasks/create-predefined-product-variants
HOTSPOT
You need to consolidate orders and prepare to rate shop shipments.
How should you complete the setup? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

DRAG DROP
You need to enable the system to correctly calculate vendor claims.
Which configurations should you use for the rebates? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

DRAG DROP
A company is configuring the handheld warehouse mobile device in Dynamics 365 Supply Chain Management Several warehouse activities are documented as required configurations. The activity configurations require a menu item in the device interface.
You need to create the menu items.
Which menu item mode should you use for each activity? To answer, move the appropriate menu item modes to the correct activities. You may use each menu item mode once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content. NOTE: Each correct selection is worth one point.

A company uses Dynamics 365 Supply Chain Management
Three assets at a single location all need the same tune-up. A single worker can complete all three tune-ups. The worker’s hours must be allocated to each asset
You need to configure the system for the worker.
Which configuration should you use?
- A . Create a consumption registration for the expenses.
- B . Create three separate work orders.
- C . Configure work line details.
- D . Create a consumption registration for the items.
A manufacturing company uses standard costs for raw materials.
The company opens a new manufacturing location that will have different standard costs for the raw materials. The differences in costs must be reflected on the finished goods.
You need to configure the site setup for the different costs.
Which two configurations can be set up? Select all answers that apply.
- A . Costing version Recording tab
- B . Item default order setting
- C . Define site on BOM lines
- D . Pending cost lines
- E . Active cost lines
A manufacturing company uses standard costs for raw materials.
The company opens a new manufacturing location that will have different standard costs for the raw materials. The differences in costs must be reflected on the finished goods.
You need to configure the site setup for the different costs.
Which two configurations can be set up? Select all answers that apply.
- A . Costing version Recording tab
- B . Item default order setting
- C . Define site on BOM lines
- D . Pending cost lines
- E . Active cost lines