Which features are supported by the back-end design of VSP 5000 systems? (Choose Two)
- A . Enhanced cooling solutions
- B . Support for high-capacity disk drives
- C . Direct cloud connectivity
- D . Disk Adapters (DKAs) for connectivity
For effective data management, it’s crucial to set up __________ on VSP 5000 systems.
- A . parity groups
- B . user accounts
- C . network parameters
- D . environmental monitors
Which statement is true about firmware updates on VSP 5000 storage systems?
- A . They can only be performed by Hitachi Vantara technicians
- B . They require the system to be in maintenance mode
- C . They are optional and not necessary for system operation
- D . They can be done automatically without any system checks
The integration of Hitachi Remote Ops SVP Agent with VSP 5000 systems allows for:
- A . Decreased system monitoring capabilities
- B . Enhanced remote management and proactive support
- C . Lower data transfer speeds
- D . Increased physical storage system size
To maintain optimal performance, VSP 5000 systems use __________ to manage data allocation effectively.
- A . SSDs
- B . Parity Groups
- C . Dynamic pools
- D . Virtual machines
The VSP 5000 series uses traditional hard disk drives exclusively.
- A . False
- B . True
Why is it important to review the VSP 5000 storage system’s pre-installation documentation and site requirements?
- A . To ensure legal compliance
- B . To prepare the site physically and environmentally for the system
- C . To configure the storage system’s network settings in advance
- D . To determine the color scheme of the system’s LEDs
What are the benefits of using Hitachi Ops Center Administrator with VSP 5000 systems? (Choose Two)
- A . Centralized management of multiple systems
- B . Reduced software licensing costs
- C . Enhanced security features
- D . Simplified firmware upgrades
What is the first step in the VSP 5000 installation process?
- A . Configuring network settings
- B . Physical assembly of components
- C . Powering on the device
- D . Software installation
What are essential components to check during the VSP 5000 system pre-installation phase? (Choose Two)
- A . Electrical grounding
- B . Airflow and cooling systems
- C . Color coordination of cables
- D . Server rack dimensions