Practice Free D-PE-OE-01 Exam Online Questions
What is a key feature introduced in OpenManage Mobile v2.0?
- A . Perform manual and batch server configuration
- B . Access iDRAC remotely
- C . Access servers remotely through OME
- D . Access SupportAssist reports
The OS and iDRAC report 120 GB of RAM. The technician has very little time to troubleshoot the issue and cannot run diagnostics.
They are working with the following information:
– Memory mode is Optimizer
– 8x 16 GB DIMMs installed
– 2 CPUs
– No entries in the SEL in the iDRAC
– No errors in the OS
To troubleshoot this issue, what action should the technician take prior to monitoring POST for any resulting errors?
- A . Reseat all memory modules
- B . Modify server profile for Performance
- C . Add an additional memory module
- D . Change memory mode to Advanced ECC
A PowerEdge server is running a hypervisor. The server must be configured to enable multiple virtual machines to share the PCIs hardware resources of a supported NIC.
Which System BIOS setting must be enabled to provide this functionality?
- A . Single Root I/O Virtualization
- B . Memory Mapped I/O above 4 GB
- C . DirectPath I/O
- D . Virtualization Technology
A server has six memory modules attached to each CPU Memory Optimizer mode is configured. The user now wants to have maximum protection for the memory but cannot afford to lose any memory space.
What should the technician install/configure?
- A . No additional memory
Switch on Single Rank Spare Mode - B . No additional memory
Switch to memory Mirroring - C . Six additional memory modules matching the original
Switch on Single Rank Spare Mode - D . Six additional memory modules matching the original
Switch to Memory Mirroring
Which processor configuration is used by the Dell EMC PowerEdge R6525 server?
- A . 4 socket Intel
- B . 2 socket AMD
- C . 4 socket AMD
- D . 2 socket Intel
A technician is using the iDRAC web GUI to upload a firmware that requires a reboot. They select the update and choose ‘Apply Update and Reboot Now’.
How could the technician determine the status of the firmware update?
- A . Access the System Setup Utility > iDRAC Settings and check the completion status in the Job Queue.
- B . Log in to the iDRAC web GUI and check the completion status in the Job Queue.
- C . Monitor the iDRAC web interface for an “Updates Completed” message in the iDRAC.
- D . Access the Lifecycle Controller > Firmware Updates menu and check the completion status in the Job Queue.
What is a key feature of Part Replacement in Lifecycle Controller?
- A . What is a key feature of Part Replacement in Lifecycle Controller?
- B . Automatically updates the configuration of the new part.
- C . Automatically updates the server configuration database.
- D . Runs a parts replacement wizard.
What is the Open Compute Project (OCP) card used for in a Dell EMC PowerEdge server?
- A . Fixed network interconnect
- B . Removal of NDC
- C . Provides a hot-swap component
- D . Consumes a PCIe slot
A technician is installing Windows Server 2016 on a server with RAID 1 and RAID 5 virtual disks.
How should they configure the server and deploy the OS?
- A . Go to system setup to configure both virtual disks
Select the Deploy OS option in the system setup utility - B . Go to Settings in the Lifecycle Controller
Configure both virtual disks using the guided OS installation method - C . Create two virtual disks using the iDRAC UI
Access the Lifecycle Controller
Go to OS deployment using ‘Deploy OS’ - D . Go to the RAID Configuration menu in the Lifecycle Controller
Create both virtual disks
Go to OS deployment using ‘Deploy OS’
What does OBPAR allow on a PowerEdge MX750c?
- A . Run a compute sled with memory overclocking.
- B . Boot a compute sled with only one CPU.
- C . Run a compute sled with maximum performance.
- D . Boot a compute sled with reduced frequency.