Practice Free C_TS422_2504 Exam Online Questions
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A . SAP Signavio Process Insights
- B . SAP Signavio Process Intelligence
- C . SAP Signavio Process Governance
- D . SAP Signavio Process Manager
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender? Note: There are 2 correct answers to this question.
- A . Planned delivery time
- B . Total replenishment lead time
- C . Operation duration
- D . Inhouse production time
What are the key features of using a low level code? Note: There are 2 correct answers to this question.
- A . To determine the priority of alternative components inside ATP
- B . To determine how costs are rolled up by product costing
- C . To determine the sequence in which materials are planned in MRP
- D . To determine the use of subitems inside material BOM (bill of material)
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.
- A . To monitor document table changes
- B . To enable integration into a sales order
- C . To save multiple changes for an object
- D . To monitor document object changes
Which of the following would you recommend as SAP’s strategic Sales and Operations planning tool?
- A . Advanced Planning
- B . Integrated Business Planning
- C . Flexible Planning
- D . Standard Sales and Operations Planning
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
- A . Opening period
- B . Total replenishment lead time
- C . Float after production
- D . Setup time
What can you use stard heuristics in Advanced Planning (PP/DS) for?
- A . To automate material movements in material staging
- B . To set default values in production master data
- C . To solve planning problems for defined objects
- D . To optimize costs times in production plans
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.
- A . Customers can grant access to the dashboard to partners.
- B . Customers can use the dashboard in the dev test production tenants.
- C . It can be accessed by using SAP For Me.
- D . It can be used in all SAP S/4HANA Cloud editions.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A . Post the goods receipt for the finished product.
- B . Reduce run schedule quantities.
- C . Post production costs to the planned order.
- D . Update statistics for the Business Information Warehouse.
- E . Create associated capacity requirements.
Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.
- A . Resource hierarchy
- B . Resource selection
- C . Resource matrix
- D . Resource network